
Midland High School
Year Built:
1929
Years of Additions/Renovations:
1953 Additions: Classrooms / Shop / Youth Center, 1956 Classroom Addition, 1957 Classroom Addition, 1959 Pool/Small Gym Addition, 1979 Vocational Bldg. Addition, 1982 Additions: Band Hall / Library & Office Renovations, 1986 Shop Storage, 1987 Tennis Bldg. Addition, 1993 Science Classroom Renovations, 1995 Elevator, 2003 Math, Science Wing / Band Hall Additions & Renovations
Square Footage:
307,980 SF
Total Site Area:
20.4 Acres
Functional Capacity:
2,180
Current Enrollment:
2,554
Bond Projects As Needed:
- Safety, Security, and Code: replace radio repeaters, install intrusion alarms, install access controls, security vestibule, remove all handicap accessibility barriers
- Civil: patch and replace concrete, new parking striping, fix any irrigation leaks, address inadequate drainage
- Exterior: remove/replace or repair exterior materials, remove/replace or repair inadequate roofing, patch and paint
- Interior: patch and paint, remove/replace damaged ceiling tiles, remove/replace or repair damaged casework, repair interior doors, remove/replace or repair damaged flooring
- MEP: repair any inadequacies in electrical systems, replace damaged light fixtures, repair plumbing leaks, repair HVAC (heating, ventilation, and air conditioning) units, repair kitchen exhaust hoods
This school is OVER functional capacity by 17.2%...
Current Enrollment: 2,554